BALLPARK WAY over COPELAND ROAD

200 FT SOUTH OF I30 · County 439, Texas · Built 1993 · 5 Lanes · 17,314 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
022200C01221002
Year Built
1993
Length
58.8 m (192.9 ft)
Max Span
33.5 m
Width
30.5 m (100.1 ft)
Lanes
5
Daily Traffic
17,314
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.