BONDS RANCH ROAD over TRIB BIG FOSSIL CRK
1.6 MI W US 287 · County 439, Texas · Built 2001 · 2 Lanes · 8,101 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
32.924367, -97.363819
This bridge is in worse condition than 40.3% of bridges in County 439. The average bridge in Texas is 0 years old; this one is 25 years old.
Nearby Bridges
BONDS RANCH RD over TRIB BIG FOSSIL CREEK
Built 1998
W Bonds Ranch Rd over Trib Big Fossil Creek
Built 2003
BAVERTON LANE over TRIB TO BIG FOSSIL CREEK
Built 2006
US 81/US 287 SB over BNSF RAILROAD
Built 1976
US81/US 287 NB over BNSF RAILROAD
Built 1970
US 81/US 287 over TRIB TO BIG FOSSIL CREEK
Built 1970
Lakemont Dr over Trib Big Fossil Creek
Built 2019
US 81/US 287 SB over BONDS RANCH RD
Built 1976
US 81/US 287 NB over BONDS RANCH RD
Built 1970
EMERALD PARK LANE over TRIB TO BIG FOSSIL CREEK
Built 2006
Bridge Details
- Structure #
- 022200AA0442001
- Year Built
- 2001
- Reconstructed
- 2016
- Length
- 21.9 m (71.9 ft)
- Max Span
- 6.4 m
- Lanes
- 2
- Daily Traffic
- 8,101
- Material
- Aluminum, Wrought Iron, or Cast Iron
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,000
- Total Project Cost
- $4,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.