US81/US 287 NB over BNSF RAILROAD
1.1 MI NW OF FM 156 · County 439, Texas · Built 1970 · 3 Lanes · 22,913 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
32.927536, -97.361183
This bridge is in worse condition than 73.1% of bridges in County 439. The average bridge in Texas is 0 years old; this one is 56 years old.
Nearby Bridges
US 81/US 287 SB over BNSF RAILROAD
Built 1976
US 81/US 287 over TRIB TO BIG FOSSIL CREEK
Built 1970
W Bonds Ranch Rd over Trib Big Fossil Creek
Built 2003
BONDS RANCH ROAD over TRIB BIG FOSSIL CRK
Built 2001
BONDS RANCH RD over TRIB BIG FOSSIL CREEK
Built 1998
US 81/US 287 SB over BONDS RANCH RD
Built 1976
US 81/US 287 NB over BONDS RANCH RD
Built 1970
BAVERTON LANE over TRIB TO BIG FOSSIL CREEK
Built 2006
Lakemont Dr over Trib Big Fossil Creek
Built 2019
EMERALD PARK LANE over TRIB TO BIG FOSSIL CREEK
Built 2006
Bridge Details
- Structure #
- 022200001415331
- Year Built
- 1970
- Length
- 91.4 m (299.9 ft)
- Max Span
- 23.8 m
- Width
- 15.3 m (50.2 ft)
- Lanes
- 3
- Daily Traffic
- 22,913
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $392,000
- Total Project Cost
- $490,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.