FM 2499 SB over SH 26 & SH 121 SB ExitRp
0.7 MI N OF BASS PRO DR · County 439, Texas · Built 2021 · 3 Lanes · 22,300 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
32.965461, -97.037539
This bridge is in worse condition than 40.3% of bridges in County 439. The average bridge in Texas is 0 years old; this one is 5 years old.
Nearby Bridges
FM 2499 NB over SH 121
Built 2020
Stars & Stripes Wy over FM 2499
Built 2015
Grapevine Mills Bl over FM 2499
Built 2016
SH26 NB to SH121NB over SH 121
Built 2019
SH 121 SB OFF-RAMP over SH 121 SB ON-RAMP
Built 2017
ROYAL LANE SB over COTTONWOOD BRANCH
Built 1986
ROYAL LANE NB over COTTONWOOD BRANCH
Built 1986
FM 2499 NB over SH 121 NB EXIT RAMP
Built 2020
BASS PRO RD over COTTONWOOD BRANCH
Built 2010
SH 121 SBTA - Bass over SH 121
Built 2020
Bridge Details
- Structure #
- 022200036401711
- Year Built
- 2021
- Length
- 162.8 m (534.1 ft)
- Max Span
- 37.2 m
- Width
- 21.9 m (71.9 ft)
- Lanes
- 3
- Daily Traffic
- 22,300
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.