FM 2499 NB over SH 121 NB EXIT RAMP
0.15 MI N OF BASS PRO DR · County 439, Texas · Built 2020 · 4 Lanes · 27,300 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
32.955961, -97.0395
This bridge is in worse condition than 40.3% of bridges in County 439. The average bridge in Texas is 0 years old; this one is 6 years old.
Nearby Bridges
SH 121 SBTA - Bass over SH 121
Built 2020
Bass Pro Drive over SH 121
Built 2020
SH121SB to IH635EB over SH 121 and IH 635 Conn
Built 2020
Ramp A - IH 635 over COTTONWOOD CREEK
Built 1981
BASS PRO RD over COTTONWOOD BRANCH
Built 2010
IH635WB to SH121NB over COTTONWOOD BR & 121 EXIT
Built 2020
SH26 NB to SH121NB over SH 121
Built 2019
SH121SB TO IH635EB over OPEN AREA
Built 2020
IH 635 WB CONN over SH 121
Built 2020
SH121SBFR-IH635EB over SH 121/IH 635 ML & RAMPS
Built 2020
Bridge Details
- Structure #
- 022200036401703
- Year Built
- 2020
- Length
- 147.8 m (484.9 ft)
- Max Span
- 38.1 m
- Width
- 21.3 m (69.9 ft)
- Lanes
- 4
- Daily Traffic
- 27,300
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.