Bass Pro Drive over SH 121
0.65 MI S OF FM 2499 · County 439, Texas · Built 2020 · 8 Lanes · 25,800 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
32.954997, -97.040542
This bridge is in worse condition than 40.3% of bridges in County 439. The average bridge in Texas is 0 years old; this one is 6 years old.
Nearby Bridges
SH 121 SBTA - Bass over SH 121
Built 2020
SH121SB to IH635EB over SH 121 and IH 635 Conn
Built 2020
FM 2499 NB over SH 121 NB EXIT RAMP
Built 2020
Ramp A - IH 635 over COTTONWOOD CREEK
Built 1981
IH635WB to SH121NB over COTTONWOOD BR & 121 EXIT
Built 2020
SH121SB TO IH635EB over OPEN AREA
Built 2020
BASS PRO RD over COTTONWOOD BRANCH
Built 2010
IH 635 WB CONN over SH 121
Built 2020
SH121SBFR-IH635EB over SH 121/IH 635 ML & RAMPS
Built 2020
SH26 NB to SH121NB over SH 121
Built 2019
Bridge Details
- Structure #
- 022200036401706
- Year Built
- 2020
- Length
- 182.9 m (600.1 ft)
- Max Span
- 39 m
- Width
- 37.6 m (123.4 ft)
- Lanes
- 8
- Daily Traffic
- 25,800
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.