IH35 NB ML Exit Rp over IH35W NB GP Lanes
1.5 MI N OF US287 / I35 · County 439, Texas · Built 2020 · 1 Lanes · 1,000 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
32.906603, -97.316986
This bridge is in worse condition than 38.7% of bridges in County 439. The average bridge in Texas is 0 years old; this one is 6 years old.
Nearby Bridges
PRESIDIO VISTA DR over TRIB TO BIG FOSSIL CREEK
Built 2009
IH 35 SB FRNTG RD over TRIB TO BIG FOSSIL CREEK
Built 2006
IH 35W over TRIB BIG FOSSIL CREEK
Built 1967
IH 35 NB FRTG RD over TRIB TO BIG FOSSIL CREEK
Built 2006
STA at Heritage Pk over IH35W
Built 2020
HERITAGE TRACE PKY over IH 35 W
Built 1997
N TA @ Tarrant Pkw over IH 35W
Built 2022
WB N TARRANT PKWY over IH 35
Built 2006
NORTH TARRANT PKWY over TRIB OF BIG FOSSIL CREEK
Built 2002
EB N TARRANT PKWY over IH 35
Built 2006
Bridge Details
- Structure #
- 022200008112347
- Year Built
- 2020
- Length
- 178 m (584 ft)
- Max Span
- 39.3 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 1
- Daily Traffic
- 1,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Local Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.