IH 35W over TRIB BIG FOSSIL CREEK

.9 MI N OF US287 OVER I35 · County 439, Texas · Built 1967 · 4 Lanes · 185,654 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
022200008112086
Year Built
1967
Reconstructed
2020
Length
25.6 m (84 ft)
Max Span
3.4 m
Lanes
4
Daily Traffic
185,654
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.