Bi Directional Rmp over IH35W SB ML Pharr

0.5 Mi. S. of Trinity Riv · County 439, Texas · Built 2018 · 2 Lanes · 165,889 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
022200001416628
Year Built
2018
Length
779.4 m (2557.1 ft)
Max Span
81.7 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
165,889
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.