IH 35W SB over PHARR ST
0.1 MI N OF 287/377 INTER · County 439, Texas · Built 1961 · 3 Lanes · 65,748 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
32.767731, -97.318597
This bridge is in worse condition than 96% of bridges in County 439. The average bridge in Texas is 0 years old; this one is 65 years old.
Nearby Bridges
IH35W SB Managed over SH 121 Pharr Belknap
Built 2016
IH35W NB ML Ramp over IH35W SB GP
Built 2018
IH 35W NB over PHARR ST
Built 1961
SH 121WB -I 35W N over US 377 WB
Built 1963
IH35W NB Managed over SH 121 Pharr Belknap
Built 2016
IH 35W (NBL) over SH 121 EB
Built 1960
Bi Directional Rmp over IH35W SB ML Pharr
Built 2018
Belknap to 35W ML over BNSF RR LIVE OAK GILVIN
Built 2018
SH 121 WB over IH 35W SBL
Built 1961
SH121 SB TO I35NB over WTHFRD/SP347 TO US377 EB
Built 1963
Bridge Details
- Structure #
- 022200001416190
- Year Built
- 1961
- Length
- 44.8 m (147 ft)
- Max Span
- 18 m
- Width
- 17 m (55.8 ft)
- Lanes
- 3
- Daily Traffic
- 65,748
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $420,000
- Total Project Cost
- $752,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.