IH 35W SB ML over UP CRI RRs & Trib Tr
0.1 Mi. S. of E. 4th St. · County 439, Texas · Built 2016 · 1 Lanes · 15,771 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
32.758417, -97.318978
This bridge is in worse condition than 40.3% of bridges in County 439. The average bridge in Texas is 0 years old; this one is 10 years old.
Nearby Bridges
IH35W NB Managed over UP CRI R/Rs & Trib Tr
Built 2016
IH 35W NB GP Lanes over UP CRI RRs & Trib Tr
Built 2015
IH 35W SB GP Lanes over RRs & E 4th Street
Built 2016
IH-35W NB GP Lanes over E. 4th Street
Built 2016
US 287 NB to 35 NB over ROW
Built 2019
I35W EAST FTG ROAD over TRIB W FORK TRINITY RIV
Built 1959
US287 NB to 35 N over IH 35W NB GP 4th RR
Built 2016
30 E to 35W NB ML over IH-35W NB
Built 2018
IH-35W SB Managed over E. 4th Street
Built 2016
IH-35W NB Managed over E. 4th Street
Built 2016
Bridge Details
- Structure #
- 022200001416617
- Year Built
- 2016
- Length
- 121.9 m (399.9 ft)
- Max Span
- 29.9 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 1
- Daily Traffic
- 15,771
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Local Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.