IH-35W NB Managed over E. 4th Street

0.3 Mi. S. of SH 121 · County 439, Texas · Built 2016 · 1 Lanes · 2,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
022200001416603
Year Built
2016
Length
88.7 m (291 ft)
Max Span
35.4 m
Width
8.5 m (27.9 ft)
Lanes
1
Daily Traffic
2,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.