SH121 N to IH20 E over IH20 EB Exit Ramp
SH121 N to IH20 E @ Exit · County 439, Texas · Built 2014 · 1 Lanes · 3,890 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
32.680078, -97.405533
This bridge is in worse condition than 40.3% of bridges in County 439. The average bridge in Texas is 0 years old; this one is 12 years old.
Nearby Bridges
SH 121 NB (NTTA) over IH-20
Built 2014
IH20WB to SH121 SB over IH 20 SH 183 & SH 121
Built 2014
IH20EB to SH121SB over Overton & SH 121 SBFR
Built 2014
SH 121 NB FR over IH 20
Built 2013
SH 121 NBFR over SH 183
Built 2013
IH 20 EB OFF RAMP over SH 183 EB ON RAMP
Built 2011
SH121NB to IH20EB over SH 183 EB
Built 2013
Chisholm NB (NTTA) over Overton Ridge
Built 2013
IH20EB to SH121 NB over IH20/SH 121/SH 183 Inter
Built 2014
Chisholm SB (NTTA) over Overton Ridge
Built 2013
Bridge Details
- Structure #
- 022200000816473
- Year Built
- 2014
- Length
- 497.4 m (1631.9 ft)
- Max Span
- 38.1 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 1
- Daily Traffic
- 3,890
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.