SH 121 NBFR over SH 183

0.1 MI. E. OF SH 121 · County 439, Texas · Built 2013 · 2 Lanes · 7,700 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
022200050402477
Year Built
2013
Length
33.8 m (110.9 ft)
Max Span
33.8 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
7,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.