SHANES LANE PCT 3 over FALLEY BRANCH
75 W OF TIN TOP RD · County 367, Texas · Built 2004 · 2 Lanes · 50 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.684783, -97.788983
This bridge is in worse condition than 25.8% of bridges in County 367. The average bridge in Texas is 0 years old; this one is 22 years old.
Nearby Bridges
TIN TOP RD PCT 3 over TRIB OF FALLEY BRANCH
Built 1946
HARMONY CIR PCT 3 over THREE MILE BRANCH
Built 2003
HARMONY RD PCT 3 over THREE MILE CREEK
Built 1995
HARMONY CIR PCT 3 over TRIB OF THREE MILE BR
Built 1944
TIN TOP RD PCT 3 over HART BRANCH
Built 1945
TIN TOP RD PCT 3 over THREE MILE BRANCH
Built 2005
FM 1884 over TRIB OF SANCHEZ BRANCH
Built 1955
Caballero Ct PCT 3 over Trib Hart Branch
Built 2021
LUTION DR PCT 3 over EAST SANCHEZ CREEK
Built 2005
Spring Creek PCT 3 over Spring Creek
Built 2019
Bridge Details
- Structure #
- 021840AA0383001
- Year Built
- 2004
- Length
- 12.2 m (40 ft)
- Max Span
- 11.9 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.