TIN TOP RD PCT 3 over TRIB OF FALLEY BRANCH

2.8 MI S OF IH 20 · County 367, Texas · Built 1946 · 2 Lanes · 4,914 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
021840AA0124002
Year Built
1946
Reconstructed
1987
Length
10.4 m (34.1 ft)
Max Span
5.2 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
4,914
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,000
Total Project Cost
$3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.