CENTER POINT PCT 4 over UNDERWOOD BRANCH
0.3 MI S OF IH 20 · County 367, Texas · Built 2003 · 2 Lanes · 1,403 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.744222, -97.726639
This bridge is in worse condition than 25.8% of bridges in County 367. The average bridge in Texas is 0 years old; this one is 23 years old.
Nearby Bridges
BANKHEAD HWY PCT 4 over WILLOW CK
Built 2003
Center Point Rd. over IH 20
Built 2017
CENTER POINT T/A over IH 20
Built 1968
IH 20 over UNDERWOOD BRANCH
Built 1968
ANNETA CTRPT PCT 4 over TOWN CREEK
Built 2005
IH 20 EBFR over Willow Creek
Built 2018
IH 20 EB over WILLOW CREEK
Built 1968
IH 20 WB over WILLOW CREEK
Built 1968
IH 20 WBFR over Willow Creek
Built 2018
E BANKHEAD DR over IH 20
Built 1968
Bridge Details
- Structure #
- 021840AA0374001
- Year Built
- 2003
- Length
- 14.9 m (48.9 ft)
- Max Span
- 14.9 m
- Width
- 8 m (26.2 ft)
- Lanes
- 2
- Daily Traffic
- 1,403
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.