BANKHEAD HWY PCT 4 over WILLOW CK

1.1 MI S OF I20 · County 367, Texas · Built 2003 · 2 Lanes · 1,586 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
021840AA0340001
Year Built
2003
Length
44.5 m (146 ft)
Max Span
16.2 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
1,586
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.