CR 511 - PCT 3 over MOUNTAIN CREEK
2.4 MI NE FM 157 N VENUS · County 251, Texas · Built 1996 · 2 Lanes · 532 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
32.503447, -97.096775
This bridge is in worse condition than 64.9% of bridges in County 251. The average bridge in Texas is 0 years old; this one is 30 years old.
Nearby Bridges
CR 511 - PCT 3 over REESE BRANCH
Built 1995
CHAMBERS ST PCT 3 over MOUNTAIN CREEK TRIB
Built 1994
FM 157 over TRIB TO MOUNTAIN CREEK
Built 1947
FM 157 over REECE BRANCH
Built 1947
HADLEY LN over DRAIN
Built 2017
ST. PAUL RD over FOUNTAIN CREEK TRIBUTARY
Built 2003
US 287 EB over SH 360
Built 2018
US 287 WB over SH 360
Built 2018
PRAIRIE RIDGE EB over SOAP CREEK
Built 2009
PRAIRIE RIDGE WB over SOAP CREEK
Built 2009
Bridge Details
- Structure #
- 021270AA0566001
- Year Built
- 1996
- Length
- 23.5 m (77.1 ft)
- Max Span
- 12.5 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 2
- Daily Traffic
- 532
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.