US 287 EB over SH 360
5.2 MI NW OF US 67 · County 139, Texas · Built 2018 · 2 Lanes · 5,600 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
32.522628, -97.082678
This bridge is in worse condition than 29% of bridges in County 139. The average bridge in Texas is 0 years old; this one is 8 years old.
Nearby Bridges
US 287 WB over SH 360
Built 2018
HADLEY LN over DRAIN
Built 2017
ST. PAUL RD over FOUNTAIN CREEK TRIBUTARY
Built 2003
SH 360 over DRAW
Built 2000
US 287 NB over ST PAUL ROAD
Built 2005
Julian Field St over Draw
Built 2019
CHAMBERS ST PCT 3 over MOUNTAIN CREEK TRIB
Built 1994
Landing St over Draw
Built 2021
Matlock Rd over Draw
Built 2018
US 287 NB over MOUNTAIN CREEK
Built 2005
Bridge Details
- Structure #
- 180710017204489
- Year Built
- 2018
- Length
- 210.6 m (690.9 ft)
- Max Span
- 34.2 m
- Width
- 11.6 m (38.1 ft)
- Lanes
- 2
- Daily Traffic
- 5,600
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.