FALLON DR over TRIB OF IRON ORE CREEK

0.5 MI E OF US 75 · County 181, Texas · Built 1998 · 3 Lanes · 2,715 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
010920C01140001
Year Built
1998
Length
52.1 m (170.9 ft)
Max Span
24.1 m
Width
21 m (68.9 ft)
Lanes
3
Daily Traffic
2,715
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.