BLUE FLAME RD over IRON ORE CREEK
0.30 MI E OF US 75 · County 181, Texas · Built 1997 · 2 Lanes · 50 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
33.700203, -96.587919
This bridge is in worse condition than 49.4% of bridges in County 181. The average bridge in Texas is 0 years old; this one is 29 years old.
Nearby Bridges
FM 691 over HONEY RUN CREEK
Built 1942
US 75 NB over FM 691
Built 1982
US 75 SB over FM 691
Built 1982
FALLON DR over TRIB OF IRON ORE CREEK
Built 1998
FALLON DR over US 75
Built 1982
US 75 SB FR over IRON ORE CREEK
Built 1984
US 75 SB over IRON ORE CREEK
Built 1987
US 75 NB over IRON ORE CREEK
Built 1984
SPUR 503 EB over US 75
Built 1987
LOY LAKE RD over IRON ORE CREEK
Built 1993
Bridge Details
- Structure #
- 010920AA0596001
- Year Built
- 1997
- Length
- 29.3 m (96.1 ft)
- Max Span
- 9.8 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $200,000
- Total Project Cost
- $250,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.