O B GRONER RD over DRAW
0.75 MI W OF JCT FM 1417 · County 181, Texas · Built 1999 · 2 Lanes · 1,402 vehicles/day
Overall
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
33.595583, -96.649817
This bridge is in worse condition than 49.4% of bridges in County 181. The average bridge in Texas is 0 years old; this one is 27 years old.
Nearby Bridges
DORCHESTER RD over DRAW
Built 1997
DORCHESTER RD over CHOCTAW CREEK
Built 1982
O.B. GRONER RD over CHOCTAW CREEK
Built 1982
FARMINGTON RD over CHOCTAW CREEK
Built 1982
ROCKPORT RD over CHOCTAW CREEK TRIBUTARY
Built 2000
FARMINGTON RD over S BRANCH CHOCTAW CREEK
Built 1988
FM 1417 over SL&SF RR
Built 1963
FORD RD over S BRANCH CHOCTAW CREEK
Built 1999
FM 1417 over SH 56
Built 2009
SOUTH TRAVIS ST over US 75
Built 2021
Bridge Details
- Structure #
- 010920AA0554001
- Year Built
- 1999
- Length
- 14.9 m (48.9 ft)
- Max Span
- 14.3 m
- Width
- 8 m (26.2 ft)
- Lanes
- 2
- Daily Traffic
- 1,402
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.