DORCHESTER RD over DRAW
0.80 MI W OF FM 1417 · County 181, Texas · Built 1997 · 2 Lanes · 180 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.586297, -96.647233
This bridge is in worse condition than 18.9% of bridges in County 181. The average bridge in Texas is 0 years old; this one is 29 years old.
Nearby Bridges
O B GRONER RD over DRAW
Built 1999
DORCHESTER RD over CHOCTAW CREEK
Built 1982
FARMINGTON RD over CHOCTAW CREEK
Built 1982
FARMINGTON RD over S BRANCH CHOCTAW CREEK
Built 1988
O.B. GRONER RD over CHOCTAW CREEK
Built 1982
FORD RD over S BRANCH CHOCTAW CREEK
Built 1999
ROCKPORT RD over CHOCTAW CREEK TRIBUTARY
Built 2000
FM 1417 over SL&SF RR
Built 1963
SOUTH TRAVIS ST over US 75
Built 2021
US 75 SOUTH U-TURN over US 75
Built 2021
Bridge Details
- Structure #
- 010920AA0156003
- Year Built
- 1997
- Length
- 27.7 m (90.9 ft)
- Max Span
- 9.1 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 180
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $60,000
- Total Project Cost
- $75,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.