SHEPPARD RD over DRAW
1.0 MI W OF US 75 · County 181, Texas · Built 2004 · 1 Lanes · 100 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.553244, -96.623469
This bridge is in worse condition than 18.9% of bridges in County 181. The average bridge in Texas is 0 years old; this one is 22 years old.
Nearby Bridges
SHEPPARD RD over DRAW
Built 1993
US 75 over SHEPHERD DR
Built 2005
FARMINGTON RD over S BRANCH CHOCTAW CREEK
Built 1988
FARMINGTON RD over CHOCTAW CREEK
Built 1982
FM 902 over CLEAR CREEK
Built 1955
SH 5 / FM 902 over US 75
Built 1963
US 75 SB over CHOCTAW CREEK
Built 1963
US 75 W FR over CHOCTAW CREEK
Built 1963
US 75 NB over CHOCTAW CREEK
Built 1963
US 75 E FR over CHOCTAW CREEK
Built 1930
Bridge Details
- Structure #
- 010920AA0529002
- Year Built
- 2004
- Length
- 6.7 m (22 ft)
- Max Span
- 3 m
- Width
- 6.1 m (20 ft)
- Lanes
- 1
- Daily Traffic
- 100
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.