FM 902 over CLEAR CREEK
0.4 MI W OF US 75 · County 181, Texas · Built 1955 · 2 Lanes · 2,252 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.529953, -96.621289
This bridge is in worse condition than 18.9% of bridges in County 181. The average bridge in Texas is 0 years old; this one is 71 years old.
Nearby Bridges
SH 5 / FM 902 over US 75
Built 1963
SHEPPARD RD over DRAW
Built 1993
US 75 over SPUR 381
Built 1965
SHEPPARD RD over DRAW
Built 2004
FARMINGTON RD over DRAW
Built 1999
US 75 over SHEPHERD DR
Built 2005
BENNETT RD over TRIB OF CEDAR CR
Built 1997
ENLOE RD over W PRONG SISTER GROVE CK
Built 1994
MCBEE RD over SQUIRREL CREEK
Built 1980
FARMINGTON RD over S BRANCH CHOCTAW CREEK
Built 1988
Bridge Details
- Structure #
- 010920051001007
- Year Built
- 1955
- Length
- 22.9 m (75.1 ft)
- Max Span
- 7.6 m
- Width
- 7.7 m (25.3 ft)
- Lanes
- 2
- Daily Traffic
- 2,252
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,000
- Total Project Cost
- $4,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.