US 75 SB FR over E FORK POST OAK CRK

0.90 MI S OF US 82 · County 181, Texas · Built 1981 · 2 Lanes · 4,415 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
010920004718234
Year Built
1981
Length
7.9 m (25.9 ft)
Max Span
2.7 m
Lanes
2
Daily Traffic
4,415
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.