US 75 over N TRAVIS ST

1.7 MI S OF US 82 · County 181, Texas · Built 2023 · 4 Lanes · 72,400 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
010920004702694
Year Built
2023
Length
77.7 m (254.9 ft)
Max Span
30.5 m
Width
18 m (59.1 ft)
Lanes
4
Daily Traffic
72,400
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.