CR 4250 over Branch of Brushy Creek

0.9 MI W of SH 19 · County 119, Texas · Built 2019 · 2 Lanes · 10 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
010600AA0194003
Year Built
2019
Length
22.9 m (75.1 ft)
Max Span
22.9 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
10
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.