FM 895 over POST OAK CREEK

0.60 MI E OF SH 19 · County 119, Texas · Built 2007 · 2 Lanes · 489 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
010600117401010
Year Built
2007
Length
21.3 m (69.9 ft)
Max Span
21.3 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
489
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.