MABRY ROAD over DRY FORK CREEK

540-529 · County 125, Tennessee · Built 1980 · 2 Lanes · 300 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
DAPFORCAT000041
Year Built
1980
Length
41.5 m (136.2 ft)
Max Span
4.4 m
Lanes
2
Daily Traffic
300
Material
Steel
Design
Culvert
Owner
Other
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.