MABRY ROAD over NOAHS SPRING BRANCH

0.25 MI E BOILING SPRING · County 125, Tennessee · Built 2008 · 2 Lanes · 300 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
DAPFORCAK0BR053
Year Built
2008
Length
9.5 m (31.2 ft)
Max Span
2.6 m
Lanes
2
Daily Traffic
300
Material
Steel
Design
Culvert
Owner
Other
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.