I26 RAMP over N. FK. ROCKY CREEK

NORTH OF ERWIN · County 171, Tennessee · Built 1981 · 6 Lanes · 13,947 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
86I00260023
Year Built
1981
Length
7 m (23 ft)
Max Span
3.4 m
Width
78 m (255.9 ft)
Lanes
6
Daily Traffic
13,947
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$297,000
Total Project Cost
$446,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.