I26 RT LN over NFA A300-PIPPEN HOLLOW R

JUST N OF ERWIN · County 171, Tennessee · Built 1983 · 2 Lanes · 16,623 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
86I00260019
Year Built
1983
Length
51 m (167.3 ft)
Max Span
14.4 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
16,623
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.