FAP 34 over SOUTH HOLSTON RIVER

8 MI. NE.OF JOHNSON CO. · County 163, Tennessee · Built 1949 · 2 Lanes · 1,904 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
82SR0340025
Year Built
1949
Reconstructed
2008
Length
384.7 m (1262.1 ft)
Max Span
121.9 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
1,904
Material
Steel Continuous
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$14,045,000
Total Project Cost
$21,068,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.