NFA A674 (SA 1003) over DOE RIVER

IN ROAN MOUNTAIN · County 019, Tennessee · Built 1960 · 2 Lanes · 1,670 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
100A6740001
Year Built
1960
Reconstructed
1991
Length
20 m (65.6 ft)
Max Span
19.1 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
1,670
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$194,000
Total Project Cost
$292,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.