FAP 22 over RAMP BC/SR 22

5 M S OF OBION RIVER · County 131, Tennessee · Built 2000 · 1 Lanes · 5,733 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
66SR0220037
Year Built
2000
Length
77.7 m (254.9 ft)
Max Span
41.8 m
Width
9.8 m (32.2 ft)
Lanes
1
Daily Traffic
5,733
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.