FAP 22 over HARRIS FORK CREEK

5 M S OF OBION RIVER · County 131, Tennessee · Built 2000 · 2 Lanes · 4,336 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
66SR0220040
Year Built
2000
Length
60 m (196.9 ft)
Max Span
20.1 m
Width
17.1 m (56.1 ft)
Lanes
2
Daily Traffic
4,336
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,206,000
Total Project Cost
$1,810,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.