RAMP SR3 TO I69 over SR3-I69 RMP/HOOSIER CRK

0.2 KM S OF I69/SR003 · County 131, Tennessee · Built 2020 · 1 Lanes · 13,129 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 8 Very Good

Location

36.393383, -89.09465

This bridge is in worse condition than 27% of bridges in County 131. The average bridge in Tennessee is 0 years old; this one is 6 years old.

Nearby Bridges

Bridge Details

Structure #
66SR0030071
Year Built
2020
Length
27.4 m (89.9 ft)
Max Span
27.4 m
Width
9.6 m (31.5 ft)
Lanes
1
Daily Traffic
13,129
Material
Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.