SR003 over BRANCH
1KM SW OF WALKER TANER RD · County 131, Tennessee · Built 2020 · 2 Lanes · 13,129 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
36.393961, -89.097619
This bridge is in worse condition than 27% of bridges in County 131. The average bridge in Tennessee is 0 years old; this one is 6 years old.
Nearby Bridges
SR003 over BRANCH
Built 2020
RAMP SR3 TO I69 over SR3-I69 RMP/HOOSIER CRK
Built 2020
I69 over HOOSIER CREEK
Built 2020
I69 over HOOSIER CREEK
Built 2020
RAMP I69 TO SR3 over I69-SR3 RMP/HOOSIER CRK
Built 2020
I 69 over I69/SR003
Built 2020
I 69 over I69/SR003
Built 2020
FAP 3 over BRANCH
Built 1968
NFA A052 over BRANCH
Built 1975
WALKER TANNER RD over FUTURE I-69
Built 2020
Bridge Details
- Structure #
- 66SR0030015
- Year Built
- 2020
- Length
- 29.6 m (97.1 ft)
- Max Span
- 29.3 m
- Width
- 16.9 m (55.4 ft)
- Lanes
- 2
- Daily Traffic
- 13,129
- Material
- Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.