SR 116 over STOCKSTILL CREEK

2 MI. N. OF SR-62 · County 129, Tennessee · Built 2024 · 2 Lanes · 240 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
65SR1160003
Year Built
2024
Length
10.4 m (34.1 ft)
Max Span
4.9 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
240
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.