NFA A283 over CROOKED FORK CREEK

E OF SR 116 IN PETROS · County 129, Tennessee · Built 1993 · 2 Lanes · 930 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
650A2830001
Year Built
1993
Length
17.5 m (57.4 ft)
Max Span
5.2 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
930
Material
Concrete Continuous
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$308,000
Total Project Cost
$463,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.