FAP 50 over SILVER CREEK

3.1 M NW MARSHALL CO LINE · County 119, Tennessee · Built 1981 · 2 Lanes · 7,137 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
60SR0500029
Year Built
1981
Length
22.6 m (74.1 ft)
Max Span
4.6 m
Width
18 m (59.1 ft)
Lanes
2
Daily Traffic
7,137
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$473,000
Total Project Cost
$710,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.