FAP 50 over SR 50 / I65

6.67 MI.S.E. JCT. SH 50-A · County 119, Tennessee · Built 1963 · 2 Lanes · 7,137 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
60I00650005
Year Built
1963
Length
106.1 m (348.1 ft)
Max Span
32.6 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
7,137
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,582,000
Total Project Cost
$5,374,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.