FAP 6 over BRANCH

3.85 MI.N. JCT. SH 20 · County 119, Tennessee · Built 1999 · 2 Lanes · 15,807 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
60SR0060085
Year Built
1999
Length
6.5 m (21.3 ft)
Max Span
4.6 m
Lanes
2
Daily Traffic
15,807
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$158,000
Total Project Cost
$238,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.