NFA 2733 over BIG BIGBY CREEK

4.16 MI.N. JCT. SH 20 · County 119, Tennessee · Built 1927 · 2 Lanes · 365 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
60SR0060007
Year Built
1927
Reconstructed
1956
Length
43.6 m (143 ft)
Max Span
8.8 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
365
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$664,000
Total Project Cost
$997,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.