FAP 27 over HOGE BRANCH

9 MI.S.OF POWELL CRSRDS. · County 115, Tennessee · Built 1930 · 2 Lanes · 2,304 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
58SR0280007
Year Built
1930
Length
7.3 m (24 ft)
Max Span
3.7 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
2,304
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$54,000
Total Project Cost
$82,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.