I24 over TENNESSEE RIVER

0.8 MI S OF SR156 · County 115, Tennessee · Built 1965 · 4 Lanes · 53,902 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
58I00240043
Year Built
1965
Length
949.3 m (3114.5 ft)
Max Span
128 m
Width
21.5 m (70.5 ft)
Lanes
4
Daily Traffic
53,902
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$69,607,000
Total Project Cost
$104,411,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.