FAS 1 over S. FORK FORKED DEER RIVE

IN JACKSON · County 113, Tennessee · Built 1958 · 2 Lanes · 10,030 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
57SR0010019
Year Built
1958
Length
117.8 m (386.5 ft)
Max Span
22.9 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
10,030
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$900,000
Total Project Cost
$1,351,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.