FAS 1 over BRANCH

3.96 MI.E. JCT. FAS 8227 · County 113, Tennessee · Built 1959 · 2 Lanes · 10,030 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
57SR0010017
Year Built
1959
Reconstructed
2000
Length
95.6 m (313.6 ft)
Max Span
8.7 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
10,030
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$665,000
Total Project Cost
$998,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.